Sources & Methods

Canada
IESO (Ontario) XML
GenOutputbyFuelHourly, DispUnconsHOEP, Ontario-Demand-multiday via reports-public.ieso.ca. Nodal market live May 2025.
ieso.ca →
AESO (Alberta) HTML
Current Supply & Demand Report (CSDReportServlet). Deregulated wholesale Pool Price market.
aeso.ca →
BC Hydro — EIA-930 BCHA (hourly, ~1h lag). ~87% hydroelectric. Site C 1,100 MW online 2025.
Hydro-Québec — Public CSV. ~95% renewable (hydro). Exporter to NY, NE, Maritime provinces.
SaskPower — EIA-930 SWPP scaled ~15% to SK. Coal phase-out by 2030.
Manitoba Hydro — Static annual report. ~98% hydro. No public real-time API.
Australia
AEMO NEM Summary 5-MIN JSON
visualisations.aemo.com.au ELEC_NEM_SUMMARY — 5-min real-time price, demand, generation for NSW, QLD, SA, TAS, VIC. No auth.
aemo.com.au →
AEMO Fuel Mix — FUEL_TYPE_NEW_5MIN endpoint. Cross-checked with openNEM (api.opennem.org.au).
AEMO WEM (WA) — EIA-930 WALC (hourly). SWIS separate from NEM. ~1.3M customers.
United Kingdom
NESO Carbon Intensity API CC BY 4.0
api.carbonintensity.org.uk — NESO + Environmental Defense Fund Europe + Oxford + WWF. 30-min resolution, 14 regions, 96-hr forecast. No auth.
API docs →
Elexon BMRS — data.elexon.co.uk/bmrs/api/v1. FUELHH half-hourly fuel mix, SYSDEM demand. Open API.
Interconnectors: IFA1+IFA2 (France 3GW), BritNed (NL 1GW), NEMO (BE 1GW), ElecLink (France 1GW), Viking (DK 1.4GW). Attribution: "Supported by National Grid ESO Open Data"
Ireland
EirGrid Smart Grid Dashboard API 15-MIN
smartgriddashboard.com DashboardService — Demand, Wind, Generation, Interconnection, CO₂ Intensity, SNSP. Regions: ALL, ROI, NI. Historical from Jan 2014. No auth.
smartgriddashboard.com →
SEMO Market Data — iSEM fuel mix reports. SNSP (System Non-Synchronous Penetration): current limit 75%, EirGrid targeting 95%.
Iceland
Orkustofnun + Landsvirkjun JS DATA
Hydro, geothermal, wind generation; installed capacity; geothermal plants; reservoir levels and history; industrial loads. Loaded from iceland_data.js.
Germany
SMARD.de (Bundesnetzagentur) 15-MIN JSON
Pattern: smard.de/app/chart_data/{filter}/{region}/{filter}_{region}_quarterhour_{ts}.json, latest {ts} from index_quarterhour.json. Filters: 410 load · 1223 lignite · 1225 wind-offshore · 1226 hydro · 1227 other-conv · 1228 other-RE · 4066 biomass · 4067 wind-onshore · 4068 solar · 4069 hard coal · 4070 pumped storage · 4071 gas · 4169 DE/LU day-ahead price. Regions: DE national + 50Hertz/Amprion/TenneT/TransnetBW control areas. Values are MWh per ¼-hour → MW = value × 4. History: same filters at day resolution (yearly chunk files, MWh/day → avg MW = ÷24) give 5 years of daily national series. No auth.
smard.de →
Energy-Charts (Fraunhofer ISE)api.energy-charts.info/co2eq?country=de for grid CO₂ intensity (gCO₂eq/kWh, non-fatal if unavailable). ENTSO-E Transparency — optional cross-checks (free token). Collector: germany.pygermany_data.js.
France
RTE éCO2mix via ODRÉ 15-MIN
odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/eco2mix-national-tr/records?order_by=date_heure desc — fields: consommation, nucleaire, eolien, solaire, hydraulique, gaz, fioul, charbon, bioenergies, pompage, ech_physiques (negative = net export), taux_co2. Licence Ouverte v2.0 (Etalab). No auth. History: 5 years of daily averages via server-side ODSQL group_by=date on eco2mix-national-cons-def (consolidated definitive, authoritative), gap-filled from the TR dataset for recent months.
opendata.reseaux-energies.fr →
Nuclear fleet — static constants in france.py from EDF/ASN public data: 57 reactors / 18 sites / ~62.9 GW incl. Flamanville 3 EPR (grid-connected Dec 2024). RTE Data Portal (data.rte-france.com, OAuth) optional for unit-level availability. Seasonal context constants (demand band ~45–88 GW, record peak 102.1 GW Feb 2012, EDF 350–370 TWh output guidance) from RTE annual reviews and EDF investor releases. Collector: france.pyfrance_data.js.
Coverage note: All scrapers use public, no-auth APIs. Static figures (Manitoba Hydro, some Australian distribution networks) sourced from annual reports. Data currency: IESO/AESO/AEMO real-time (5–15 min lag); UK/Ireland 30-minute intervals. Regenerate via canada.py, australia.py, uk.py, ireland.py, iceland.py, germany.py, france.py. Fallback: if a *_data.js file is absent, the page renders embedded DEMO values and badges the section DEMO DATA; run the matching collector and deploy the emitted JS file alongside this page to go LIVE.
← Home
IHS Energy Grid Radar — International
● LIVE
Country
International Energy Grid Research
International grid operators — generation, demand, carbon intensity, and policy across Canada, Australia, UK, Ireland, Iceland, Germany, and France
AI
International Grid Research Agent
Gemini 2.0 Flash · Canada · Australia · UK · Ireland · Iceland · Germany · France
Hi — I'm the International Grid Research Agent. I cover electricity systems in Canada (IESO, AESO, BC Hydro, Hydro-Québec), Australia (AEMO NEM + WEM), the United Kingdom (NESO), Ireland (EirGrid/iSEM), Iceland (Landsnet/Landsvirkjun/Orkustofnun), Germany (50Hertz, Amprion, TenneT, TransnetBW via SMARD), and France (RTE éCO2mix). Ask me about generation mix, market design, carbon intensity, renewables policy, or how AI data centers are affecting these grids.
Agent ready
Country Comparison Loading…
CountryOperator(s)Market Type Total GenRenewable %Carbon Intensity Key FuelCurrency
Loading data…
🇨🇦
Canada
6 Provincial Operators — IESO · AESO · BC Hydro · Hydro-Québec · SaskPower · Manitoba Hydro
~85% renewable Provincial ISOs No national ISO
SRC: IESO · AESO · EIA-930 · Hydro-Québec
🇦🇺
Australia
AEMO — NEM (5 regions: QLD, NSW, VIC, SA, TAS) + WEM (Western Australia)
~46% renewable 5-min settlement SA world-leading
SRC: AEMO 5-min · openNEM · EIA-930 WALC
🇬🇧
United Kingdom
NESO — National Energy System Operator (est. Oct 2024). England, Scotland, Wales.
Loading… Clean Power 2030 8 interconnectors
SRC: NESO CI API (CC BY 4.0) · Elexon BMRS
🇮🇪
Ireland
EirGrid (ROI) + SONI (NI) — iSEM all-island market since October 2018
~60% renewable SNSP tracking 80% RE target 2030
SRC: EirGrid Smart Grid Dashboard · SEMO
🇮🇸
Iceland
Hydro + geothermal island grid — reservoirs, geothermal plants, industrial loads, and near-100% renewable electricity
100% renewable Hydro + geothermal 28 gCO₂/kWh
SRC: Orkustofnun · Landsvirkjun · Landsnet
🇩🇪
Germany
4 TSOs — 50Hertz · Amprion · TenneT · TransnetBW. Energiewende grid; nuclear exit complete Apr 2023.
~58% renewable 4 TSOs 80% RE target 2030
SRC: SMARD.de · Energy-Charts (Fraunhofer ISE)
🇫🇷
France
RTE — Europe's largest nuclear fleet (57 reactors, 18 sites) and biggest net power exporter
~63% nuclear ~32 gCO₂/kWh Top EU exporter
SRC: RTE éCO2mix via ODRÉ (Licence Ouverte v2.0)
Coverage MapClick a country to drill in
Renewable
Total Gen
Currency
🇨🇦 Canada — Provincial Grid Operators
No single national ISO. IESO (ON) and AESO (AB) are deregulated wholesale markets; BC Hydro, Hydro-Québec, SaskPower, and Manitoba Hydro are Crown utilities.
Total Generation
MW
Renewable %
national average
Operators
6
provincial ISOs + Crown
Key Market
IESO/AESO
deregulated wholesale
National Fuel Mix
Coverage
Canada has no single national grid operator. Provinces manage their own electricity systems. National renewable share ~85% — among the highest in the G7, dominated by BC Hydro and Hydro-Québec's massive hydroelectric systems.
Operator
Metric
Fuel Mix — AESO
Renewable Mix Comparison
Forecast Target
⚡ Demand
🔋 Generation
💲 Price
Horizon
Model
Confidence Interval

Model Performance
RMSE
MAPE
Coverage
Forecast
Federal Policy
Clean Electricity Regulations (CER) — Net-zero electricity grid by 2035 (draft). Phaseout of unabated fossil fuels from electricity.
Clean Electricity Investment Tax Credit — 15% ITC for non-emitting generation and storage.
Net-Zero Accelerator — $8B to decarbonize heavy industry and accelerate clean tech.
Smart Renewables & Electrification Pathways — $1.56B for wind, solar, storage, smart grid projects.
Market Notes
IESO (Ontario) — Nodal pricing launched May 2025. ~75% nuclear+hydro. Coal fully retired 2014.
AESO (Alberta) — Canada's only fully deregulated energy-only market. No capacity market. Wind target ~35% by 2030.
Hydro-Québec — World's largest hydro system. Major exporter to NY, NE, Maritime provinces. ~99% renewable.
SaskPower — Coal phase-out by 2030. Bekevar Wind (+200 MW) online 2025.
Data Exports
🇦🇺 Australia — AEMO NEM + WEM
AEMO's NEM is the closest international analog to a US ISO — competitive wholesale market covering QLD, NSW, VIC, SA, TAS. 5-minute settlement since 2021. WA (SWIS) operates separately.
NEM Total Gen
MW
NEM Renewable
% of generation
WEM Total Gen
MW (Western Australia)
WEM Renewable
% of WEM generation
NEM Fuel Mix
WEM Fuel Mix
NEM Coverage Note
NEM covers QLD, NSW, VIC, SA, TAS (~9M customers, ~200 TWh/yr). 5-minute settlement since October 2021. Solar+wind now >35% of annual generation. South Australia reached 100%+ renewables on >100 days in 2024. WEM (SWIS) operates separately — ~1.3M customers in SW Western Australia. WEM public live feed discontinued; EIA-930 WALC used.
Market
Metric
NEM Fuel Mix
Regional Prices (AUD/MWh)
Forecast Target
⚡ Demand
🔋 Generation
Horizon
Model
Confidence

RMSE
MAPE
Coverage
Forecast
Capacity Investment Scheme
CIS (2023) — Government underwriting of new clean dispatchable capacity. Replaces proposed Capacity Mechanism.
Rewiring the Nation — $20B+ transmission investment to connect renewable energy zones (REZs) to the grid.
Renewable Energy Target — 82% renewable electricity by 2030 (national target).
SA Battery — Hornsdale Power Reserve (Tesla Big Battery) — world's largest grid-scale battery at commissioning. SA now a global lab for 100%+ renewables operation.
Market Notes
NEM 5-Min Settlement — Implemented Oct 2021. Prices can range from −$1,000 to +$16,600 AUD/MWh (VoLL).
Integrated System Plan (ISP) — AEMO's 20-year roadmap for orderly coal retirement and REZ development.
Coal Retirements — Most coal units retiring 2025–2035. Eraring (NSW, 2.9 GW) extended to 2027.
AEMO WEM Transition — SWIS transitioning from a capacity-based to a hybrid energy + reserve market structure.
Data Exports
🇬🇧 United Kingdom — NESO
National Energy System Operator (est. Oct 2024) — independent from National Grid plc. Rich open data ecosystem: Carbon Intensity API (CC BY 4.0) provides 30-min forecasts 96 hrs ahead for 14 GB regions. Government target: 100% clean power by 2030.
Total Generation
MW
Renewable %
% of mix
Carbon Intensity
gCO₂/kWh ·
Top Fuel
highest MW source
Generation Mix
NESO Overview
NESO became independent from National Grid plc in October 2024 — the UK's first independent, whole-system energy operator. Manages electricity and, from 2026, gas networks. Clean Power 2030 mandate: decarbonize the electricity system by the end of 2030.
National Carbon Intensity NESO API · CC BY 4.0
14 DNO Regions
RegiongCO₂/kWhIndex
Loading…
Metric
Carbon Intensity Over Time
Fuel Mix (MW)
Historic Mix (30 Days)
GB InterconnectorsTotal cross-border capacity
NameCountryCapacity (MW)Status
Forecast Target
🌿 Carbon Int.
🔋 Generation
Horizon
Model
Confidence

RMSE
MAPE
Coverage
Forecast
Data Exports
🇮🇪 Ireland — EirGrid / iSEM
EirGrid (ROI) + SONI (NI) operate the all-island Single Electricity Market (iSEM). Ireland tracks SNSP — System Non-Synchronous Penetration — the unique metric for real-time wind/solar share of grid inertia. Current limit: 75%, target 95%.
Demand
MW (all-island)
Wind Generation
MW · % of demand
CO₂ Intensity
gCO₂/kWh
Renewable %
total mix
All-Island Fuel Mix
Annual Stats
Metric
Region
Wind vs Demand
Wind % vs CO₂
SNSP — System Non-Synchronous PenetrationEirGrid target: 95%
What is SNSP?

SNSP measures what percentage of electricity comes from non-synchronous sources (wind, solar, HVDC imports) vs synchronous generators (gas, hydro) that provide natural grid inertia.

Current limit: 75% — EirGrid is the only TSO in the world to have pushed this so high. Target is 95% SNSP via grid-forming inverters and synthetic inertia.

Ireland's wind resource and small grid size make it a global laboratory for high-penetration renewables operation.

Forecast Target
💨 Wind
⚡ Demand
🌿 CO₂
Horizon
Model
Confidence

RMSE
MAPE
Coverage
Forecast
Climate Action Plan 2024
80% Renewable Electricity by 2030 — CAP 2024 flagship target.
9 GW Onshore Wind + 5 GW Offshore Wind by 2030.
8 GW Solar PV by 2030.
Celtic Interconnector — 700 MW to Brittany, France. Under development, expected ~2026.
iSEM — Single Electricity Market operating all-island since October 2018. Covers ROI + Northern Ireland. Regulated by CRU (ROI) and Utility Regulator (NI).
Net Zero by 2050 — Climate Action & Low Carbon Development Act 2021.
EU ETS — Carbon price ~€50–70/tCO₂.
Interconnectors
NameEndpointCapacityStatus
EWICWales (GB)500 MWLive
GreenlinkWales (GB)500 MWLive
MoyleScotland (NI→GB)500 MWLive
CelticBrittany (France)700 MWIn Development
Data Exports
🇮🇸 Iceland — Hydro + Geothermal Grid
Loaded from iceland_data.js: real-time snapshot, fuel mix, installed capacity, geothermal plants, reservoirs, and industrial loads.
Demand
MW
Renewable %
of generation
CO₂ Intensity
gCO₂/kWh
Installed Capacity
MW
Fuel Mix
Capacity Mix
Generation Mix
Reservoir Fullness
Data Exports
🇩🇪 Germany — Four-TSO Energiewende Grid
Four transmission system operators — 50Hertz, Amprion, TenneT, TransnetBW — regulated by the Bundesnetzagentur. Nuclear exit completed April 2023; target 80% renewable electricity by 2030. Data via SMARD.de open API, loaded from germany_data.js.
Total Generation
MW
Renewable %
of mix
CO₂ Intensity
gCO₂/kWh
Top Fuel
highest MW source
Generation Mix
Energiewende Overview
Europe's largest power system has no single national ISO — four private TSOs balance their own control areas under Bundesnetzagentur regulation and EU market coupling. The nuclear exit was completed in April 2023; lignite and hard coal phase out by 2038 (2030 ambition). Wind + solar routinely exceed 60% of instantaneous generation, driving the north–south HVDC buildout (SuedLink, SuedOstLink).
Metric
Fuel Mix
Renewable % by TSO
Forecast Target
⚡ Demand
💨 Wind
☀️ Solar
Horizon
Model
Confidence

RMSE
MAPE
Coverage
Forecast
Energiewende Targets
80% Renewable Electricity by 2030 — EEG 2023 flagship target (~50%+ achieved on annual basis).
115 GW Onshore Wind + 30 GW Offshore Wind by 2030 (70 GW offshore by 2045).
215 GW Solar PV by 2030 — Solarpaket I streamlined permitting.
Klimaschutzgesetz — net greenhouse gas neutrality by 2045, five years ahead of the EU.
EU ETS + national carbon price — BEHG heating/transport carbon levy alongside EU ETS.
Phase-Outs & Grid Buildout
Nuclear Exit Complete — Isar 2, Emsland, and Neckarwestheim 2 shut down 15 April 2023.
Coal Phase-Out by 2038 — Kohleausstiegsgesetz; government ambition to pull forward to 2030 ("ideally").
SuedLink & SuedOstLink — ~4 GW-class HVDC corridors moving North Sea wind to southern load centers, mid-2020s commissioning.
Kraftwerkssicherheitsgesetz — tenders for new H₂-ready gas backup capacity to firm the renewable system.
Bidding Zone Debate — single DE/LU price zone under EU review; potential north/south split.
Data Exports
🇫🇷 France — RTE Nuclear-Hydro Grid
RTE (Réseau de Transport d'Électricité) operates Europe's largest nuclear fleet — 57 reactors across 18 sites — plus major Alpine and Pyrenean hydro. Among the lowest carbon intensities of any large grid. Data via RTE éCO2mix, loaded from france_data.js.
Demand
MW
Nuclear Share
of generation
CO₂ Intensity
gCO₂/kWh
Net Exports
MW cross-border
Generation Mix
RTE Overview
RTE is the single national TSO, spun out of EDF under EU unbundling rules. Nuclear typically supplies 60–70% of French electricity, making France Europe's largest net power exporter and one of its lowest-carbon large grids (~20–50 gCO₂/kWh). Flamanville 3 — the first new French reactor since 1999 — connected to the grid in December 2024.
Nuclear Fleet Availability
Seasonal Demand Contextsummer trough ↔ winter peak
~45 GW summer trough~88 GW winter peak
Reactors
in operation
Fleet Capacity
MW
Sites
nuclear power plants
Current Output
MW nuclear ·
Metric
Nuclear vs Demand
Fuel Mix (MW)
Forecast Target
⚛️ Nuclear
⚡ Demand
🌿 CO₂
Horizon
Model
Confidence

RMSE
MAPE
Coverage
Forecast
Energy Policy
EPR2 Program — 6 new EPR2 reactors committed (Penly, Gravelines, Bugey) with an option for 8 more; first concrete targeted late 2020s.
Flamanville 3 EPR — 1,650 MW, grid-connected December 2024; first new reactor since Civaux 2 (1999).
ARENH Ended — regulated nuclear access price expired end-2025, replaced by EDF/state CfD-style framework.
PPE 3 — multi-annual energy program: nuclear life extension to 60 years, ~offshore wind and solar acceleration.
Net Zero 2050 — SNBC national low-carbon strategy; electricity already ~90%+ low-carbon.
EU ETS — carbon price ~€50–70/tCO₂; marginal for a fleet this low-carbon.
Interconnectors
LinkEndpointCapacityStatus
Data Exports