Sources & Methods

Canada
IESO (Ontario) XML
GenOutputbyFuelHourly, DispUnconsHOEP, Ontario-Demand-multiday via reports-public.ieso.ca. Nodal market live May 2025.
ieso.ca →
AESO (Alberta) HTML
Current Supply & Demand Report (CSDReportServlet). Deregulated wholesale Pool Price market.
aeso.ca →
BC Hydro — EIA-930 BCHA (hourly, ~1h lag). ~87% hydroelectric. Site C 1,100 MW online 2025.
Hydro-Québec — Public CSV. ~95% renewable (hydro). Exporter to NY, NE, Maritime provinces.
SaskPower — EIA-930 SWPP scaled ~15% to SK. Coal phase-out by 2030.
Manitoba Hydro — Static annual report. ~98% hydro. No public real-time API.
Australia
AEMO NEM Summary 5-MIN JSON
visualisations.aemo.com.au ELEC_NEM_SUMMARY — 5-min real-time price, demand, generation for NSW, QLD, SA, TAS, VIC. No auth.
aemo.com.au →
AEMO Fuel Mix — FUEL_TYPE_NEW_5MIN endpoint. Cross-checked with openNEM (api.opennem.org.au).
AEMO WEM (WA) — EIA-930 WALC (hourly). SWIS separate from NEM. ~1.3M customers.
United Kingdom
NESO Carbon Intensity API CC BY 4.0
api.carbonintensity.org.uk — NESO + Environmental Defense Fund Europe + Oxford + WWF. 30-min resolution, 14 regions, 96-hr forecast. No auth.
API docs →
Elexon BMRS — data.elexon.co.uk/bmrs/api/v1. FUELHH half-hourly fuel mix, SYSDEM demand. Open API.
Interconnectors: IFA1+IFA2 (France 3GW), BritNed (NL 1GW), NEMO (BE 1GW), ElecLink (France 1GW), Viking (DK 1.4GW). Attribution: "Supported by National Grid ESO Open Data"
Ireland
EirGrid Smart Grid Dashboard API 15-MIN
smartgriddashboard.com DashboardService — Demand, Wind, Generation, Interconnection, CO₂ Intensity, SNSP. Regions: ALL, ROI, NI. Historical from Jan 2014. No auth.
smartgriddashboard.com →
SEMO Market Data — iSEM fuel mix reports. SNSP (System Non-Synchronous Penetration): current limit 75%, EirGrid targeting 95%.
Coverage note: All scrapers use public, no-auth APIs. Static figures (Manitoba Hydro, some Australian distribution networks) sourced from annual reports. Data currency: IESO/AESO/AEMO real-time (5–15 min lag); UK/Ireland 30-minute intervals. Regenerate via canada.py, australia.py, uk.py, ireland.py.
← US Grid
IHS Energy Grid Radar — International
● LIVE
Country
International Energy Grid Research
Anglosphere grid operators — generation, demand, carbon intensity, and policy across Canada, Australia, UK, and Ireland
AI
International Grid Research Agent
Gemini 2.0 Flash · Canada · Australia · UK · Ireland
Hi — I'm the International Grid Research Agent. I cover electricity systems in Canada (IESO, AESO, BC Hydro, Hydro-Québec), Australia (AEMO NEM + WEM), the United Kingdom (NESO), and Ireland (EirGrid/iSEM). Ask me about generation mix, market design, carbon intensity, renewables policy, or how AI data centers are affecting these grids.
Agent ready
Country Comparison Loading…
CountryOperator(s)Market Type Total GenRenewable %Carbon Intensity Key FuelCurrency
Loading data…
🇨🇦
Canada
6 Provincial Operators — IESO · AESO · BC Hydro · Hydro-Québec · SaskPower · Manitoba Hydro
~85% renewable Provincial ISOs No national ISO
🇦🇺
Australia
AEMO — NEM (5 regions: QLD, NSW, VIC, SA, TAS) + WEM (Western Australia)
~46% renewable 5-min settlement SA world-leading
🇬🇧
United Kingdom
NESO — National Energy System Operator (est. Oct 2024). England, Scotland, Wales.
Loading… Clean Power 2030 8 interconnectors
🇮🇪
Ireland
EirGrid (ROI) + SONI (NI) — iSEM all-island market since October 2018
~60% renewable SNSP tracking 80% RE target 2030
Coverage MapClick a country to drill in
Renewable
Total Gen
Currency
🇨🇦 Canada — Provincial Grid Operators
No single national ISO. IESO (ON) and AESO (AB) are deregulated wholesale markets; BC Hydro, Hydro-Québec, SaskPower, and Manitoba Hydro are Crown utilities.
Total Generation
MW
Renewable %
national average
Operators
6
provincial ISOs + Crown
Key Market
IESO/AESO
deregulated wholesale
National Fuel Mix
Coverage
Canada has no single national grid operator. Provinces manage their own electricity systems. National renewable share ~85% — among the highest in the G7, dominated by BC Hydro and Hydro-Québec's massive hydroelectric systems.
Operator
Metric
Fuel Mix — AESO
Renewable Mix Comparison
Forecast Target
⚡ Demand
🔋 Generation
💲 Price
Horizon
Model
Confidence Interval

Model Performance
RMSE
MAPE
Coverage
Forecast
Federal Policy
Clean Electricity Regulations (CER) — Net-zero electricity grid by 2035 (draft). Phaseout of unabated fossil fuels from electricity.
Clean Electricity Investment Tax Credit — 15% ITC for non-emitting generation and storage.
Net-Zero Accelerator — $8B to decarbonize heavy industry and accelerate clean tech.
Smart Renewables & Electrification Pathways — $1.56B for wind, solar, storage, smart grid projects.
Market Notes
IESO (Ontario) — Nodal pricing launched May 2025. ~75% nuclear+hydro. Coal fully retired 2014.
AESO (Alberta) — Canada's only fully deregulated energy-only market. No capacity market. Wind target ~35% by 2030.
Hydro-Québec — World's largest hydro system. Major exporter to NY, NE, Maritime provinces. ~99% renewable.
SaskPower — Coal phase-out by 2030. Bekevar Wind (+200 MW) online 2025.
Data Exports
🇦🇺 Australia — AEMO NEM + WEM
AEMO's NEM is the closest international analog to a US ISO — competitive wholesale market covering QLD, NSW, VIC, SA, TAS. 5-minute settlement since 2021. WA (SWIS) operates separately.
NEM Total Gen
MW
NEM Renewable
% of generation
WEM Total Gen
MW (Western Australia)
WEM Renewable
% of WEM generation
NEM Fuel Mix
WEM Fuel Mix
NEM Coverage Note
NEM covers QLD, NSW, VIC, SA, TAS (~9M customers, ~200 TWh/yr). 5-minute settlement since October 2021. Solar+wind now >35% of annual generation. South Australia reached 100%+ renewables on >100 days in 2024. WEM (SWIS) operates separately — ~1.3M customers in SW Western Australia. WEM public live feed discontinued; EIA-930 WALC used.
Market
Metric
NEM Fuel Mix
Regional Prices (AUD/MWh)
Forecast Target
⚡ Demand
🔋 Generation
Horizon
Model
Confidence

RMSE
MAPE
Coverage
Forecast
Capacity Investment Scheme
CIS (2023) — Government underwriting of new clean dispatchable capacity. Replaces proposed Capacity Mechanism.
Rewiring the Nation — $20B+ transmission investment to connect renewable energy zones (REZs) to the grid.
Renewable Energy Target — 82% renewable electricity by 2030 (national target).
SA Battery — Hornsdale Power Reserve (Tesla Big Battery) — world's largest grid-scale battery at commissioning. SA now a global lab for 100%+ renewables operation.
Market Notes
NEM 5-Min Settlement — Implemented Oct 2021. Prices can range from −$1,000 to +$16,600 AUD/MWh (VoLL).
Integrated System Plan (ISP) — AEMO's 20-year roadmap for orderly coal retirement and REZ development.
Coal Retirements — Most coal units retiring 2025–2035. Eraring (NSW, 2.9 GW) extended to 2027.
AEMO WEM Transition — SWIS transitioning from a capacity-based to a hybrid energy + reserve market structure.
Data Exports
🇬🇧 United Kingdom — NESO
National Energy System Operator (est. Oct 2024) — independent from National Grid plc. Rich open data ecosystem: Carbon Intensity API (CC BY 4.0) provides 30-min forecasts 96 hrs ahead for 14 GB regions. Government target: 100% clean power by 2030.
Total Generation
MW
Renewable %
% of mix
Carbon Intensity
gCO₂/kWh ·
Top Fuel
highest MW source
Generation Mix
NESO Overview
NESO became independent from National Grid plc in October 2024 — the UK's first independent, whole-system energy operator. Manages electricity and, from 2026, gas networks. Clean Power 2030 mandate: decarbonize the electricity system by the end of 2030.
National Carbon Intensity NESO API · CC BY 4.0
14 DNO Regions
RegiongCO₂/kWhIndex
Loading…
Metric
Carbon Intensity Over Time
Fuel Mix (MW)
Historic Mix (30 Days)
GB InterconnectorsTotal cross-border capacity
NameCountryCapacity (MW)Status
Forecast Target
🌿 Carbon Int.
🔋 Generation
Horizon
Model
Confidence

RMSE
MAPE
Coverage
Forecast
Data Exports
🇮🇪 Ireland — EirGrid / iSEM
EirGrid (ROI) + SONI (NI) operate the all-island Single Electricity Market (iSEM). Ireland tracks SNSP — System Non-Synchronous Penetration — the unique metric for real-time wind/solar share of grid inertia. Current limit: 75%, target 95%.
Demand
MW (all-island)
Wind Generation
MW · % of demand
CO₂ Intensity
gCO₂/kWh
Renewable %
total mix
All-Island Fuel Mix
Annual Stats
Metric
Region
Wind vs Demand
Wind % vs CO₂
SNSP — System Non-Synchronous PenetrationEirGrid target: 95%
What is SNSP?

SNSP measures what percentage of electricity comes from non-synchronous sources (wind, solar, HVDC imports) vs synchronous generators (gas, hydro) that provide natural grid inertia.

Current limit: 75% — EirGrid is the only TSO in the world to have pushed this so high. Target is 95% SNSP via grid-forming inverters and synthetic inertia.

Ireland's wind resource and small grid size make it a global laboratory for high-penetration renewables operation.

Forecast Target
💨 Wind
⚡ Demand
🌿 CO₂
Horizon
Model
Confidence

RMSE
MAPE
Coverage
Forecast
Climate Action Plan 2024
80% Renewable Electricity by 2030 — CAP 2024 flagship target.
9 GW Onshore Wind + 5 GW Offshore Wind by 2030.
8 GW Solar PV by 2030.
Celtic Interconnector — 700 MW to Brittany, France. Under development, expected ~2026.
iSEM — Single Electricity Market operating all-island since October 2018. Covers ROI + Northern Ireland. Regulated by CRU (ROI) and Utility Regulator (NI).
Net Zero by 2050 — Climate Action & Low Carbon Development Act 2021.
EU ETS — Carbon price ~€50–70/tCO₂.
Interconnectors
NameEndpointCapacityStatus
EWICWales (GB)500 MWLive
GreenlinkWales (GB)500 MWLive
MoyleScotland (NI→GB)500 MWLive
CelticBrittany (France)700 MWIn Development
Data Exports